CDMA Drive Test Analysis
on monday, july 16, 2007, i go to semarang at 06.00 in the morning, we arrive in semarang at 07.00 in Ahmad Yani airport, me and mas oka handiman usually we said oka, will do ULO with dirjen Postel in solo and jogja, before we go to jogja and solo we stay 1 night in semarang, go to office and take a result of drive test for solo and jogja, this is the analyze...
feeder swap
feeder swap is installation fail, cause to achieve the OnAir target or etc, usually feeder swap in sector 1 to sector 2 or sector 0 to sector 3, as plan sector must 1 handled the call but in actual sector 2 handled the MS. this is feeder swap factor. solution foer feeder swap is we must swap back again the feeder to the normal position, do not need expert engineer, just need field engineer to swap the feeder.
cannot call
there are a lot of reason for this fail, lack of FER [Frame Erasure Rate], Ec/Io to high, or a lot of pilot polution, this three reason is main reason if MS cannot do a call, HO failure from 4 hand to 3 hand or softer HO cannot make drop call or call pre release. cause the MS still handled by another hand to do a call..
Site overshooting
Site oversoot is cause 1 sector shoot to another sector in high power, this overshoot make there are no dominant PN in MS, cause there are a lot of PN with high power in MS.
the solution for this oovershoot sector is tilting the sector, reduce power in the sector is the ast solution, for this failed.